Sign In | Join Free | My vivirlatino.com
vivirlatino.com
HuizhouHeChen Mechanical Equipment Co.,Ltd.
HuizhouHeChen Mechanical Equipment Co.,Ltd. Pofessional in PU Foam Injection Machine; Inovative in Polyurethane Foam Sheets! Mob.: +86 15802533851 Amy Chi
Home > PU Foaming Machine >

Pu Foam Machine / Full Automatic C Pentane Pu Pouring Machine

Pu Foam Machine / Full Automatic C Pentane Pu Pouring Machine

Brand Name : HeCheng, or ODM
Model Number : HC-203 model
Certification : FCC
Place of Origin : China (mainland), Guangdong
MOQ : 1 Set
Price : Negotion
Payment Terms : L/C, Western Union, Cash in RMB
Supply Ability : 10 sets each two months
Delivery Time : 30 days after the down payment
Packaging Details : Enhenced wooded box for seaworthy packing.
Category : Automatic Pu Foam Machine
Processing mode : Auto Circle System
Energy Consumption power : 40 kw
Total power : 55 kw
Weight : 2500 KG
Temp. range : 20 celcius to 40 celcius
Contact Now

Maybe you haven't known about me - ,

but you might have used products

made by my Foaming Machine


Pu Foam Machine / Full Automatic C Pentane Pu Pouring Machine


Preface


HC-203 Series High Pressure Polyurethane (PU) Foaming Machine Introduction


HC-203 Series High Pressure Polyurethane (PU) Foaming Machine was designed and upgraded by integrating European technology standards and our all these years achievements, has been widely appreciated by our customers at home and abroad.


General Parameters:

Type

HC-203

maximum working pressure

20MPa

Pouring rate

4~9kg/min

Working temp.

20°c~40°c

Driving mode

Fully automatic

Power supply by 3-phase 4 wires

380V/50Hz/60Hz

Air supply pressure

0.5~0.9MPa 1M³/min

Pipe insulation power

3500W

Material ratio

1:1 ~ 1:5


HC- 203 series PU Foaming Machine:


High pressure PU Foaming Machine has been widely introduced in fields of chilling and icing industry, air conditioning, refrigerating industry, cold storing industry, insulation materials and so on.


Two components and multi-components are available


It 's ideal for ice tanks, chilling closets, ice boxes, refridgerators, cooling houses and other cold insulation funactional products.

1. Equipments productivity

polyurethane foam machine matches with sole molding molding line(60 position or more), we produce

polyurethane soles by 50 shoe moulds, 10 hours one day and 8 circles/hour, as the rotating speed, it can yield

4000 pairs of soles per day.
2. Polyurethane foamed machine matches with sole upper-link molding production line(60 position), we are

produce 10 hours one day and 8 circles/hour, as the rotating speed, it can yield 1200 pairs of soles per day.
3. Double color, double density polyurethane sole or upper-link molding shoe products, this techniques should be

second pouring, so productivity will be decline.


Controling System:


1, With the state of the art computer controlled system to gain the machinery more efficiency and reliability.

2, Self-diagnositic, alarming and monitoring functions and multi-language alternatives.

3, Preset technical parameters.

4, Emergent halt protection device.



Applicable products:


  1. Ice tank
  2. Refridgerator
  3. Ice cell
  4. Cold room
  5. Cold storage room

Some of Our Patents and Credits:


With the whole teams effort, we have achieved 16 patents on equippment and PU sandwich panels manufacturing, they are represented by:

ure PU Foaming Machine with Flowrate 50G/S To 1000G/S Adjustable



Contact us via:


Mobile / Whatsapp: +86 188196 55160 (Ms. Sabrina Shing);

Email: puvip(at)126 (dot) com


Huizhou HeCheng Mechanical Equipment Co., Ltd.


Welcome OEM / ODM Order


1. PU Injection Machine

2. Hydraulic Mold Carriers

3. Edge Shaver for PU Cornice

4. PU Foam Sheets Lamination Lines

5. PU Sandwich Panel Production Lines;

6. (Non-) Standard Configuration PU Foaming Equipment;


Packaging:



Our Partners:



FAQ:

1. How long will your engineer reach our factory?
Within one week after the machine arrived at your factory.


2. How many days will you finish installing?
For low pressure and high pressure injection machines, 10 days will be enough for our technicians to

complete the equipment installation, erection, start-up commissioning and personnel training.

For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are

necessary for our technician to complete the assembly, installation, erection, start-up commissioning

and personnel training.


3. What would be charged for your engineers to install and train our people at oversea plant?
Usually are the costs invoving in the asigned ngineer's visa, air tickets, acommodations,

and their salary. It is our policy to charge USD 150 per capita per day.


6. Does your engineer understand English?
Our engineers understand a little English. All of our engineers have more than five years mechanical

installation experience. In addition, they can use body language to communicate with your people.


7. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.


Product Tags:

Polyurethane Injection Equipment

      

Polyurethane Injection Molding Machine

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Pu Foam Machine / Full Automatic C Pentane Pu Pouring Machine Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: HuizhouHeChen Mechanical Equipment Co.,Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0